Our 3‑Phase Install Process
Crystal‑clear gates, tidy documentation, and a clean hand‑off—optimized for UniFi networks, Wi‑Fi, and Protect cameras.
Veteran‑run
Design → Install → Support
Greater Houston
Design → Install → Support
Greater Houston
1
Sales Meeting
Discuss goals, explain the 3‑phase process, review any floor plans, and schedule your on‑site survey.
2
Site Survey
Walk the property, capture RF and camera vantage data, validate cabling routes, and build the design.
3
Design → Install → Signoff
Finalize BOM and quote, perform a clean install, test, document, and onboard to managed support.
Phase 1 — Sales Meeting
- Present UniFi stack benefits (APs, cameras, switching, remote mgmt).
- Explain our 3‑phase process and sign‑off gates.
- Collect any existing floor plans and site context.
- Schedule the on‑site survey.
Deliverables
Brochure
Intro proposal (cost range)
Tentative survey date
Phase 2 — Site Survey
- Walk with printed floor plan or sketch; note construction materials & ceiling heights.
- Measure walls; record interference sources and backhaul options.
- RF scans/heatmap; camera vantage, FOV, and lighting checks.
- Power, rack/MDF/IDF planning; conduit/pathways & labeling plan.
Deliverables
Survey notes & photos
Predictive heatmap
Bill of Materials (BOM)
Scope, assumptions, exclusions
Install schedule draft
Phase 3 — Design → Install → Support
- Finalize BOM and fixed quote; approve change order if needed.
- Clean install: proper PoE budgets, terminations, and cable management.
- Validation: RF, throughput, camera framing, retention.
- Documentation: as‑builts, labels, admin access policy.
- Onboard to Managed Support (monitoring, backups, change control).
Deliverables
Signed fixed quote
As‑built drawings
Test results & sign‑off
Owner training
Managed Support enrollment
Process FAQs
How long does the process take?
Most single‑site installs complete in 1–3 weeks from survey, depending on scope and materials.
Do you work after hours?
Yes—by request. We often schedule changes outside your operating hours to avoid disruption.
What if plans change mid‑project?
We issue a change order for approval and adjust the schedule and BOM transparently.